Refacing keeps the cabinet boxes on the wall and replaces everything you touch or see: doors, drawer fronts, hinges, pulls, and a veneer over the frames. It suits a kitchen whose layout is right and whose boxes are sound, and it is the shortest wait on the calendar because doors are made faster than boxes.
- Lasts
- Ten to fifteen years
- Wait to arrive
- 2 to 4 weeks
- A 120 to 200 sq ft kitchen
- $18,000 to $32,000

What would push the number past the range
- 01A slab kitchen with the drains in the wrong place adds the concrete saw and a day
- 02Custom cabinets add weeks before they add dollars; both are on the plan
- 03A house before 1978 gets a lead test before demolition, and the answer can add a week
Asked about refaced cabinets
How do I know if my boxes are sound?
Open the one under the sink. If the floor of it is flat and dry and the sides are not swelling, they are usually fine. If it is soft, the water has been in it, and that box at least is coming out.
Can I change the layout with refacing?
No, and that is the trade. Refacing is for the kitchen whose layout works. Moving a run means new boxes, which is the replace scope.
Do new counters go on old boxes?
Yes, and it is the most common refresh we do. The boxes are shimmed level first, because a quartz counter shows every dip the old laminate hid.
The other two
The weeks and the number, then the work.
An hour in your kitchen, then a drawing, a dated calendar and one figure with every line shown.