Seminole Heights · illustrative
Replace, same footprint, semi-custom shaker

Kitchen remodeling in Hillsborough County
The weeks the sink is gone and what the whole job comes to. Both settled before you decide.

Seminole Heights · illustrative
Replace, same footprint, semi-custom shaker

Palma Ceia · illustrative
Back to the studs, wall out, island in

Carrollwood · illustrative
Refresh: refaced doors, new counters, same layout
Drawn for the demo. A client's site shows the kitchens they built.
Three ways to do it, priced at your size. The cabinets set the biggest line and the longest wait, so each card names them.
the whole job
$37,950 to $64,750
11½ to 19 weeks start to finish · 5½ to 8 weeks without a kitchen
Or about $499 to $852 a month over 10 years at 9.9%
Typical for Hillsborough County, with the eight percent contingency a low quote leaves out already inside it. Your quote comes after the room is measured. Example terms on an ordinary home-improvement loan, not an offer; the lender quotes the rate.

Who is doing the work
“I draw the plan and I sign the weeks on it. If the cabinets are late, you hear it from me the day I hear it, with the new date.”
Priya · Owner, Marlowe Kitchens · illustrative
Five and a half to eight weeks on a typical replace, inside a job of eleven and a half to nineteen. The cabinets are built to order and nothing comes out until they are in our warehouse, so most of the waiting happens with your old kitchen still working.
On a house older than about twenty years, yes. Something is behind the wall that the drawing did not know about. A quote without a contingency has not removed that risk; it has moved it to a change order on week five. Ours is on the plan from the start, and it comes back to you if it is not spent.
Almost everybody stays. We set the fridge, the microwave and a folding counter up in the dining room or the garage on the first morning, and the water is off for about a day in total. The hard week is the one waiting for the counters, when the kitchen looks finished and has no sink.
Yes, and it is on the calendar as a stage rather than as an afterthought. Hillsborough County turns a kitchen permit round in one to three weeks depending on whether a wall or the plumbing moves, and the inspection is booked before the counters go on.

An hour in your kitchen, then a drawing, a dated calendar and one figure with every line shown.
Replace · $37,950 to $64,750 · 11½ to 19 weeks