Custom cabinets are built to the drawing by a shop, so a run can be exactly the length of the wall and a pantry exactly the depth the room allows. They are the reason a back-to-the-studs kitchen waits longest, because the shop starts when the drawings are signed and finishes when they are finished. On the budget they are the biggest line by a distance.

Lasts
Thirty years and more
Wait to arrive
6 to 10 weeks
A 120 to 200 sq ft kitchen
$60,000 to $95,000
An open-plan kitchen under a board-marked concrete ceiling, a long travertine island where a wall used to be, and glazing to the garden
Palma Ceia · illustrative

What would push the number past the range

  1. 01A slab kitchen with the drains in the wrong place adds the concrete saw and a day
  2. 02Custom cabinets add weeks before they add dollars; both are on the plan
  3. 03A house before 1978 gets a lead test before demolition, and the answer can add a week

Asked about custom cabinets

Is custom worth it on an ordinary kitchen?

Usually not. Custom earns its wait when the room is awkward, the ceiling is high, or the finish is one nobody makes. On a straight run in a standard house, semi-custom gets you the same kitchen a month sooner.

Can the wait be shortened?

By signing the drawings early. The shop's clock starts at the signature, not at demolition, and we do not take a kitchen out until the boxes are built.

Who builds them?

A shop we have used before, named on the plan, with their own lead time written against the cabinets line. You can visit it.

The weeks and the number, then the work.

An hour in your kitchen, then a drawing, a dated calendar and one figure with every line shown.